Demo

The Open Experience ecosystem

The construction site that documents itself.

Software can only document what someone captures — so we build the helmet camera and the webcam ourselves and connect our partner's weather station directly. All three record your construction site automatically; the platform turns that into complete, time-stamped documentation.

Site manager wearing the DIGIBAU 360 helmet camera during a site walk

What does "self-documenting construction site" mean?

A self-documenting construction site captures its condition continuously and automatically: the DIGIBAU 360 helmet camera records every site walk in full 360°, the Construction Webcam captures progress around the clock, and Construction Weather provides the weather data. All captures flow automatically into the Open Experience platform — located, timestamped, searchable. The site manager no longer documents; they supervise.

The difference lies in the connection

Every capture lands automatically in the right project, at the right location, with the right timestamp — alongside your defects, reports, and checklists. With software-only vendors, you piece together camera, third-party subscription, and integration yourself; with us, it is one system.

  • One responsibilityHardware, software, support — one contact partner, no interface debates.
  • Automation instead of disciplineDocumentation happens even when nobody on site thinks about taking photos.
  • Depth of evidenceA complete 360° history over time — walk virtually through the construction site as it was two years ago.

Software and our own construction site hardware — at Open Experience from a single source, matched down to the last detail.

And the next step is already underway

OXI is our wheeled-leg robot: it carries the OX sensor suite across the construction site — 40 cm obstacles, 30% inclines, two-hour quick-swap battery, safe remote operation. This makes capture reproducible, even where nobody goes every day.

  • Sensors on boardOXI carries DIGIBAU 360 across the site and documents even the areas nobody visits every day.
  • KRITIS3D research project"Thinking safety digitally": 3D surveying, robot-based capture, and AI object recognition outdoors.

See OXI at the Construction Robotics Showroom

Why this is more than a gadget

  • DIGIBAU 360 — world premiere 2021, market launch 2022, born from the digiBau research project
  • From single-family homes to major projects with 100,000+ defects
  • Software + hardware from a single source — matched down to the last detail
  • Every site walk complete instead of spot checks — the 360° walkthrough can be recalled for any point in time

Frequently asked questions

Do I need the hardware to use the software?

No — every software product works on its own. The hardware makes documentation automatic and complete; it is not a must.

Do I buy or rent the devices?

Both are possible; we clarify the terms in the demo meeting based on your project duration.

Does the hardware also work with other software?

The devices are built for the OX platform — that is where their added value comes from: automatic locating, timestamps, project assignment.

What happens to people in the captures?

DIGISCHUTZ automatically detects and pixelates people and faces — directly in the system, GDPR-compliant.

Who sets up the devices?

We accompany the rollout personally: commissioning, the first site walk, and training your team are all part of it.

See the self-documenting construction site live.

We show you a real 360° site walk — and what arrives in the platform afterwards.